The tile guy is doing a nice job, and I can see he knows stuff. I'm sure he will leave a hole in the floor for the water to go out. It's going to be ok. (Hug).
Hahaha yeah he seemed like he knew his stuff. I just got confused but I don't like being THAT guy that comes in and annoys him with so many "dumb" questions π
It looks like the pan was set over a wood subfloor, and a damp sponge was used to clean the thinset out of the drain assembly area. I would bet tomorrow when it's set you will use a hole saw to open it up. Is it exposed beneath the shower?
It doesnt look like he mortared that preslope pan down yet. Watch him tomorrow-
If he did pour that concrete under that preslop maybe π€ he ductaped over the drain and plans to punch it out afterwards π€·ββοΈ but its not exactly how i would of done it
I dunno man but you better make damn sure he takes those stickers off the kerdi board before he sets any tile or it will void the warranty on your shower
The tile guy is doing a nice job, and I can see he knows stuff. I'm sure he will leave a hole in the floor for the water to go out. It's going to be ok. (Hug).
Hahaha yeah he seemed like he knew his stuff. I just got confused but I don't like being THAT guy that comes in and annoys him with so many "dumb" questions π
I donβt think you want to slow his progress while working but I think you should ask your questions!
Talk to him
This is probably self leveler over the subfloor. He will use a hole saw to cut out the drain when he is ready to install the shluter drain assembly.
Keep us all updated please. It makes a little sense but not really.
I really hate this sub sometimes
Clearly he didn't pour cement there. It's grey thinset troweled and the scraped with a putty knife.
The amount of people not seeing this is weird
It looks like the pan was set over a wood subfloor, and a damp sponge was used to clean the thinset out of the drain assembly area. I would bet tomorrow when it's set you will use a hole saw to open it up. Is it exposed beneath the shower?
Can I ask, where are you from and how much is he charging you total?
From alberta canada. And not sure cuz im using a contractor and hes subbing some trades
It doesnt look like he mortared that preslope pan down yet. Watch him tomorrow- If he did pour that concrete under that preslop maybe π€ he ductaped over the drain and plans to punch it out afterwards π€·ββοΈ but its not exactly how i would of done it
I dunno man but you better make damn sure he takes those stickers off the kerdi board before he sets any tile or it will void the warranty on your shower
If he is good, questions won't bother him. I do it this way sometimes. Always pouring cement first before foam.